Lotto di Pompeiana (San Remo)
Motorway lot including double carriageway tunnels for an overall length of 1,700 lm and a viaduct 500 lm long with 80 lm high pylons, made using prefabricated girders installed with launching gantry over spans of 40 lm.
Motorway lot including double carriageway tunnels for an overall length of 1,700 lm and a viaduct 500 lm long with 80 lm high pylons, made using prefabricated girders installed with launching gantry over spans of 40 lm.