The project includes:

 

  • New three-arm roundabout in Campazzi, for the connection to the existing road network and the new railway underpass (Trento-Malé line).
  • Artificial tunnel (1756 m) under the agricultural areas east of the Trento-Malé railway, with exit in Cassina.
  • Three-arm roundabout in Cassina, connected to a new link road and a roundabout in Piazza Fiera (Cles centre).
  • Viaduct over the Dres stream (150 m), with a mixed steel-concrete structure.
  • Second artificial tunnel (447 m) between the hamlet of Dres and Lake Santa Giustina, with exit at the Castellaz road junction.

•          New intersection near Castellaz, with roundabout and connections with the S.P. 139 and local roads

Committente:

Provincia Autonoma di Trento

Anno di Realizzazione:

2025-2027