Descrizione lavoro:
– Construction of collection works under lake Cavedine
– Pressurised branch tunnel 4,000 lm in length and section of 45m² with creation of the Drena window
– Manway from the collection work to the tunnel
Committente:
S.I.S.M. – SOCIETA’ IDROELETTRICA SARCA – MOLVENO – MILANO