Line 3 – Lot 2/A from Via Turati to Piazza Duomo – Milano

Descrizione lavoro:

Construction of subway line in double track tunnel for a length of 1,600 lm, including 3 stations (Turati – Manzoni – Duomo), access and ventilation shafts

Carried out in loose grounds with special treatment and earth consolidation methods

Work carried out together with Imprese Torno S.p.A. and Guffanti S.p.A.

Committente:
METROPOLITANA MILANESE S.p.A.

Anno di realizzazione:
1983 -1991