Descrizione lavoro:
The work includes the design and execution of hydraulic repair works on the river Isarco, consisting in bank walls, reshaping and regularisation of the river bed for a stretch of 6.2 km.
Work carried out together with Impresa Rabbiosi S.p.
Committente:
MINISTERO DEI LAVORI PUBBLICI MAGISTRATO ALLE ACQUE - VENEZIA