Design and execution for the rehabilitation of the Giurgiu Bridge over the Danube on State Road DN5 km 64+884 – including the access road from the customs exit to the bridge entrance.

Descrizione lavoro:

Works include:

– consolidation and rehabilitation of the 2.8 km long road bridge;
– execution of the access ramps;
– modernisation of the existent car parks and customs access roads;
– construction of a new car park at the Bulgarian border;
– construction of a round-about.

Committente:
CNADNR (Compagnia Nazionale Autostrade e Strade Nazionali – Romania)

Anno di realizzazione:
2014 – 2017