Design and construction of the cableway connection – Genoa Port – Forte Begato

Descrizione lavoro:

Design and construction of the cableway connection between the Principe Maritime Station and Forte Begato in Genoa with an intermediate access station to the park and sports areas of the former Gavoglio barracks.

The track develops for about 2.5 km.

 

Work performed in RTI with Doppelmayr S.r.l. Italy.

Committente:
COMUNE DI GENOVA

Anno di realizzazione:
2023-2025