Construction of the so-called “Expo catwalk” for the 2015 Universal Exposition.

Descrizione lavoro:

– Construction of the 10 ml wide and 500 ml long pedestrian catwalk connecting the Rho-Fiera site with the EXPO site.
– Construction made of metallic carpentry and reinforced cement floor slab with prefabricated composite floor slabs
– Railway overpass
– Technological plants
Work in association with: I.C.G. S.r.l.

Committente:
EXPO 2015 S.p.A.

Anno di realizzazione:
2013-2015