Branch of water for irrigation purposes from the river Adda lot II – Medolago

Descrizione lavoro:

– Construction of hydraulic tunnel for a length of 5,350 lm and Ø of 3.55 lm finished, carried out in loose grounds with protection and cladding in prefabricated shells

– Pumping station for a capacity of m /sec 1.5 and head of 50 lm

– Structure for crossing the river Dordo in underpass

– Hydraulic repairs to the river Dordo with side walls and bottom thresholds

Committente:
CONSORZIO DI BONIFICA DELLA MEDIA PIANURA BERGAMASCA E DELL'ISOLA - BERGAMO

Anno di realizzazione:
1981 - 1984