Branch of water for irrigation purposes from the river Adda lot 4 (Medalogo)

Descrizione lavoro:

– Costruction of hydraulic primary feed tunnel with structure in reinforced concrete for a capacity of 10 m ³/ sec and an overall length of 14.000 lm

– Punping station and capacity branch for delivery  to the existing secondary mains

– Road-motorway and railway crossing

Committente:
CONSORZIO DI BONIFICA DELLA MEDIA PIANURA BERGAMASCA E DELL'ISOLA - BERGAMO

Anno di realizzazione:
1986 -1991