S. Massenza I hydroelectric power plant

Descrizione lavoro:

– Construction of drainage tunnels with a section of 12 m² and a length of 4.000 lm for the branch of the River Arnò and tributaries with 3 access windows.
– Collection and dam on the river Arnò and pressurised branch tunnel

Committente:
S.I.S.M. – SOCIETA’ IDROELETTRICA SARCA – MOLVENO - MILANO

Anno di realizzazione:
1949 - 1951