Construction design execution of the Trento Nord – Rocchetta road link. Section: Zambana Vecchia, exit for S.S. 43 towards Fai della Paganella.

Descrizione lavoro:

Length of road stretch 5.500 m including:

– 2 tunnels each 3.700 m long

– Ululone bridge with metal framework

– works of art – movement of materials – paving

– 2 exits

– tecnological facilities

Committente:
PROVINCIA AUTONOMA DI TRENTO

Anno di realizzazione:
2006 - 2009