Descrizione lavoro:
– Costruction of hydraulic primary feed tunnel with structure in reinforced concrete for a capacity of 10 m ³/ sec and an overall length of 14.000 lm
– Punping station and capacity branch for delivery to the existing secondary mains
– Road-motorway and railway crossing
Committente:
CONSORZIO DI BONIFICA DELLA MEDIA PIANURA BERGAMASCA E DELL'ISOLA - BERGAMO